0 .
○■ ということで、つ り「死ね!... With the notion that where you say, in other words “die!”It is with the [tsu] lever, a liberal translation
○■ It takes apart that, or h ides or, just [tsu] [te] story
○■ 3月12日午前2時45分 東... March 12th 2:45 AM, Tokyo Electric Power Company conveyed when 1 it seems that pressure inside the Containment Vessel of the machine reaches two times the supposition maximum level in atomic energy safety preservation institute,
○■ When unevenness eye Chair man Hosono fills the seawater, when there is a danger re-criticality of doing
○■ 現場の吉田所長の 断は正しい... The judgment of Chief Yoshida on of site is correct
○■ It changes into water thr ough through the chilled water which accumulates the steam inside the reactor to the tank resets to the furnace, it is the device of critical moment, a liberal translation
○■ 「菅首相の大失態 された首相... “菅 Seawater fill discontinuance of the prime minister order which makes the large mistake of the prime minister was “vision”
○■ This is obvious, is not a nything less than the large-scale “棄 people” by the Japanese government
○■ 「(真水から)海 への切り替え... “(From the fresh water) completely there are no times when the possibility of becoming re-critical increases with change to the seawater”, “because seawater fill was transmitted to the prime minister and 'side did and' entered,” “the prime minister being one person, because it made a noise,” with “you do not recognize that kind of thing”, that it was Buto who is exchanged in question of the press corps which is said, but it is certain for intention understanding to have been lacking with government and Tokyo Electric Power Company,
○■ Seawater fill discontinua nce and prime minister indication with negative = Fukushima 1.1st number machine Hosono advisor [Jiji Press, Ltd. 2011 May 21st 20:34
○■ そして、誰もいな なった、と... It probably becomes the result that and, everyone stopped being?, a liberal translation
○■ 海水注入に関する 題で、55分... It caused scandal that with the problem regarding seawater fill, it was discontinued over 55 minutes but…
○■ But, in me you could deli ver the core information which is different completely from the plural routes,” - - when around, “is about 2 weeks to which the mass communications announce problem ago” - - after all, the story of the official residence was lie, government announcement and the Tokyo Electric Power Company announcement the roller roller changed “concerning this problem,
○■ 吉田所長以下作業 の気持は「l... As for feeling of operator below Yoshida chief “let's roll!”That was, you guess
○■ 吉田昌郎
○■ With the same nuclear pla nt after fresh water fill becomes impossible, Yoshida 昌 郎 with the judgment of the chief March 12th 7:4 PM test fill of the seawater started in
○■ 青山氏は4月下旬に 福島第1原... Aoyama inspected the Fukushima 1st nuclear plant in late April, Yoshida 昌 郎 heard from the chiefs and took and investigation did
○■ Yoshida of the same nucle ar plant 昌 郎 the chief being arbitrary in accordance with the decision of the head office, because you say, that it continued pouring water, don't you think? the head office stated the dealing of Chief Yoshida
○■ 「(真水から)海 への切り替え... These are talking of Japanese blogoholic.
○■ In regard to Chief Yoshid a of the same nuclear plant judging pouring water continuation individually, “as a result, the fact that fill was continued was not the mistake”, that doing, Yoshida's dealing unless there is a necessity, showed recognition
○■ この点について東 は「当時、... Tokyo Electric Power Company “at that time, there was such report from the power plant, but it was not appropriate report”, that corrected announcement contents concerning this point
|
|